Systems
ZED Certified operations with structured quality, documentation and continuous-improvement orientation.
BMF supports coating requirements through route review, surface preparation control, testing support and customer documentation.
Performance is determined by the complete route: incoming condition, preparation, processing, inspection, handling and application environment.
ZED Certified operations with structured quality, documentation and continuous-improvement orientation.
Route review, pretreatment, masking, thickness / film build and acceptance criteria.
Thickness checks, DFT / destructive testing where applicable and visual inspection.
Certificates, inspection reports and customer-format documents where applicable.
Each order is reviewed against the drawing revision, purchase specification and acceptance criteria.
| Process family | Typical references | Practical review points |
|---|---|---|
| Zinc flake | ISO 10683, customer automotive / fastener specifications | Coating route, mass, topcoat, curing, SST and fitment areas. |
| Xylan / PTFE | Customer specification, datasheet, approved sample | Pretreatment, film build, curing, masking, friction and environment. |
| Manganese phosphate | ISO 9717, customer phosphate specification | Surface condition, coating weight, oil/post-treatment and application. |
| Passivation | ASTM A967, ASTM A380/A380M | Stainless grade, heat tint, weld areas, contamination and appearance. |
| Salt spray | ASTM B117, ISO 9227 or customer method | Test method is separate from acceptance hours and failure criteria. |
RoHS support is chemistry- and process-specific. Documentation is discussed based on the selected finish system and customer format.
RoHS-conscious finishing options can be reviewed where specified.
Declarations are provided based on available process and chemistry documentation.
Sampling, inspection, test certificate and approval-batch support where applicable.